First through Day 5

Our first through fifth days were right before we went on vacation.  Attached are the photos of the build.  At the end of the build I will give an entire materials list of what we used and a basic run down of cost on this build.  This is our first tiny build but not our last.

20160815_160336
The Beginning
20160816_164816
First Purchase
20160816_193820
The Base layout
20160817_170834
Floor Joist Setup
20160817_173046
In Floor Insullation
20160817_183907
Our ‘subfloor’
20160821_180335
Our Roof Truss – Todds Complete Design- Less Height Great Strength!
20160822_175540
Our Wall Base Boards
20160822_175625
Wall Base Boards First Layout of Appliance Attempt
20160823_180726
First Studs Going up
20160823_180746
First Studs from the front
20160824_150106
Loft Floor Joists in… most of first floor studs in
20160824_150128
Day 3 sees an end to the First floor and door frames in
20160825_144409
Day 4 Start of upper floor
20160825_181503
End of Day 4
20160826_193146
Day 5 Ceiling Trusses IN!
20160827_101504
Roof Sheathed!
20160827_125239
Side being dried In
20160827_125251
See The awesome Arch!
20160827_152031
Dried in Ready for Vacation
20160827_152058
Completely Dried In

 

 