Days 30-31

So the last 2 days of working on Tiny, we have done the pipe for the venting the hot water heater, ordered all the appliances (composting toilet, refrigerator, solar and wind power, all the modules to go with them – all arriving this week), painted layer 2 and 3 on the walls and finished the floor in the kitchen since we go get the refrigerator today!!! We are sooooo close!!

Paint layer 2

 

 

 

 

 

 

Floors in Kitchen: Sealed, Sanded, Stained and Cleared.

 

 

 

 

 

 

 

The Third layer of Paint DONE! (well minus where I could not walk on the floors yet)

 

 

 

 

 

 

 

 

 

 

 

 

 

TOMORROW: I do the bathroom – mastic and paint everything I can including drylok the floor so I can then get ready for the Toilet and tiling. 😀