Day 12 and 13

This weekend was days 12 and 13 working on Tiny.

Day 12 we completed the wall studs and ceiling/closet floor, the bathroom door build and the electrical for tiny (not including the installation of the lighting.)  We do however have plugins that work inside her now!  We also drew out and started placement of the externally attached storage for the propane tanks and electrical units we will need to make sure that tiny is self sufficient.

Day 12 – Installed the Stud walls for the bathroom and built the bathroom door for the barn door track we have to install.

Shower Wall
Shower Wall
Bathroom Studs
Bathroom Studs
Bathroom Studs with Door
Bathroom Studs with Door

Day 13 – Installed all the plugins and placed the light switches.  Ran the lines and Tested.  Tiny is running on her own.

Living & Bedroom Walls of Electrics Installed and Working
Living & Bedroom Walls of Electrics Installed and Working
Kitchen Wall Electrics Installed and Working
Kitchen Wall Electrics Installed and Working
Back Up Generator
Back Up Generator