Hubby went back to work the day after coming back from Vacation. Work has slowed up.  We are officially on Day 11 of our build but we are physically 3 months into it.  After this next post I will be going back to day to day posting.  I feel bad that I did such a great job on the last blog and I have rushed to put this one back together.

DAY 6 – All the exterior wood was put into place so we could reseal it and start on the window and door placement. * realize that we were stopped midstream due to rain also.

14359169_10210158741745717_6322518436041201200_n
First-Second Layer
14484777_10210158741345707_3118152656859840076_n
Sheeting Halfway Done
14462932_10210170924330274_2938053101964247877_n
Second Layer Edge Sealed
14212618_10210158740105676_8473410871043360732_n
Second Layer Complete
14463177_10210170925450302_6668381857585669558_n
front seam sealed.
14448808_10210170922770235_6589625327779356968_n
Ace Sealed from the Weather
14492394_10210170923330249_6557811769894213943_n
Another View of Sealed!

DAY 7 – We opened up the sealant and Placed the door and 2 windows in.

14492562_10210224182981707_8306245802638178864_n
Opening Up Sealant To Place Door
14523177_10210224182741701_8629180841753056728_n
Sealed with First Window in!
14523257_10210234814287483_5461613976376892848_n
Sealed with Second Window IN
14522715_10210234815247507_6806349212584382701_n
Door Sealed in Also
14573050_10210234814967500_6256899411636913236_n
Roof Resealed!

DAY 8 – We built the 2 platforms for plumbing and storage, also the stairs to the loft.

14517427_10210286249973343_1978162408833571399_n
Bathroom Riser
14590315_10210286249653335_4110339735962626687_n
Storage Platforms Almost Completed
14495367_10210295803492175_1616665423642201024_n
Stairs Before installation
14563388_10210295803132166_5530622814229205972_n
Platform Done Stairs to loft in Place
14657519_10210485872083771_7983062476375596145_n
Bathroom/Kitchen Platforms/ Shower Basin Set In Place

DAY 9 – All the interior wall insulation done and shower basin in, lights recieved.

20161013_144207
Insulation!
shower-base
Our 24x24x12 shower basin
20161013_111013
another view of insulation
12v-led
12v-led

DAY 10 – Insulation in the ceiling, purchased flooring, and stove

Ceiling Insulation
Ceiling Insulation
Flooring
Flooring
20161015_181626
Our Stove

DAY 11 – Ceiling wood in.

14695410_10210485869283701_4453582548238346134_n
Ceiling!

 