Day 43

We have most everything done, however, the weather has not been cooperating for us to move Tiny and set her up permenantly….

In the mean time, we are selling the house we are living in and most all of its contents.  So if you know of any one looking for a getaway cabin with a beach a block away and water inlet for boats… (could be sold fully furnished)  let them know, let us know, spread the word.  Thank you

Below is the zillow/trulia listing….

http://u.zillow.com/p3S8UE/

https://www.facebook.com/marketplace/item/149666375587284

day 42 and driveway

This has been another 2 weeks of getting things ready but not working but one day on Tiny.  Unless you include having to replace items that were broken.  We had an issue with one of the solar panel connectors and a charge controller hookuped up.

We also have been working diligently to get our pulling vehicle on the road all the way, which has been trying to nickel and dime us every step of the way.  I say nickel and dime but it is more like $300 here $300 there.  Our 220 mile test run of the van went very well and we are now going to take it on the long haul to Kansas for a graduation next week. This means it will be another 2 weeks before we really get to work on Tiny again (unless we squeeze more storage building into the weekend – 5 more pieces to build)

So day 42 was spent in the kitchen putting in custom built to fit storage – since nothing comes standard 😀

And today, I took a fly by trip to the property and we have a driveway!!!! YAYAYAYA!!!!!!

Day 40 and 41 Storage and Trim

Friday night we got the pulling van running such an awesome easy fix.  Luck was with us on this! Now, I need to find new seats and new dash parts for it to fix little things.

Day 40:  We did the storage for around the bed and under the kitchen area.  Each pullout is on wheels, with the for diminsions being 14x17x47 , 14x18x47, 14x17x40 and 14x17x34 giving us alot of rolling storage for dry goods, appliances and other incidentals.

34 x 17 x 14 rolling storage
17 x 14 x 47 inch rolling storage
all storage except the one that goes in front

Around the bed storage… (still needing the bottoms lined) but they are 14 inches tall and 9 inches wide with one wall being 89 inches and the other being 72.  alot of storage added.

89 inches of 14 inch x 9 inch storage
72 inch x 14 inch x 9 inch storage
Storage / bed view when on the floor now
view to below from other side of bed

Day 41: Today, Trim Header and Footer boards and dressing up the wheel well so we could put a drop down counter on that side.

BASE AND CORNER BOARDS
‘CROWN MOULDING’ – aka Header boards
Hammered Copper Wheel Well
Between the Beam Headers

We have 3 more areas for storage to add:

  1. under the futon sofa which is 2 @ 29x29x14 on wheels (which will hold shoes, weights, guest pillows, outdoor items etc
  2. the over head drop down storage that will be 2 @ 4x89x14 and 1 @ 4x66x14 (incidental storage)
  3. The over toilet storage which will be once the toilet is hooked up.

We are also getting the land set up for the driveway…

Day 38 and 39

This weekend we spent putting things together for the kitchen… and the loft railing. Nothing major just alot of small jobs.

This is the railing to hold us up in the loft so we don’t fall into the kitchen while sleeping

Our stove and kitchen counters are in!!! Hinged so each side can lift independantly. This way I have a place to fold laundry or prep food. ( we are still working on the under stove storage, and found that I have 6 inches on top of the washer to make storage for things like cutting boards 😀

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Our canned good in wall storage rack…. hard to see I will get a better picture posted.  However, when the bathroom door is open, you can not see it at all ;D

 

 

 

 

 

This week we will finish up the small odds and ends that we can so next weekend we will put the composting toilet completely in, build boxes for the storage areas and hopefully move in for the test run.

 

 

 

Day 36 and 37

So I was out for 2 weeks… leg up, non weight bearing knee surgery and since I had my ankle done 9 months ago and reinjured it – on the opposite leg and I am not good at balancing: Crutches were way out in left field for me. Oh yeah AND it was Mr.’s birthday… Happy Birthday ( on the 28th of March) to my most wonderful love and partner in life.

I am back with day 36 and 37 of work progress.

Yesterday the wiring, panel, charge controller, plugs  were set up… we did have one issue so it was fixed today.

 

 

 

 

 

 

 

 

Along with this we also built the frames for the solar panels to mount too.  Making them portable yet stable.

 

 

 

 

 

 

On Day 37: We repaired the wiring issue, and finished mounting the panels and wiring them together.  We are now completely on solar!!! YAY!!!

 

 

 

 

 

 

 

 

We are looking at building the railing boxes, the kitchen, and installing the toilet in the next week… its been getting less difficult, yet more difficult to work these days with such nice weather and the urge to go fishing and canoeing.  However, we are looking at the fact that once we do get Tiny done… we will have alot of time to do this.

 

Day 34 and 35

On days 34 and 35: We mounted a rack on the back for the batteries and wind generator pole.

 

After we did this we created the slide out bed/sofa and I ordered the mattress for it. I must say it is rather comfy – inner spring serta full sized mattress.

The rack on the back was done…only to change our minds about how it was made and Todd then welded a different one on. He measured, placed, cut, and welded the rack, while I found the cases for the batteries. MUCH more sturdy!

 

 

 

 

 

 

I did the floors in the bathroom and we did the floors in the rest of tiny. (only have to add the base boards now.)

 

 

 

 

 

Our next projects are storage for the under the kitchen, under the sofa, above the sofa and around the master bed. Oh, and we can not forget the building/mounting of the kitchen stove/moveable countertop over the washer.

Make best of hanging storage between the ceiling joists. Swing down the drawers to be available while working, and out of the way when done working.
Under the Bedroom & above the sofa storage
drop in storage cubes chest
Around the Master bed (only shorter 13″ tall)
Related image
Under the sofa and kitchen storage
around the bed windows
Around the Bedroom Window
lift up counter top for over the washer
EcoStorage 11.5 in. W x 17.75 in. D x 16.5 in. H Steel Wire in Cabinet Pull-Out 2-Tier Drawer
under stove storage.

Day 33

We put the Mattress, Toilet, Washer, Refrigerator in place.

 

 

 

 

 

 

 

 

 

 

 

 

 

We installed the bathroom barn door.

 

 

 

 

 

 

 

 

Tomorrow we are going to get the storage boxes around the bed and the stove rack done.

We also received the Wind and Solar generators and another storage rack for the back….. We are going to get the Batteries this week.

 

Today Day 32

Before the Toilet arrives….

I smoothed, painted, sealed and stained the bathroom from TOP to BOTTOM.  Note that a 6ft x 2ft bathroom is a very very tight space to get a paint can, yourself and the brush in… (especially when you just did the adjacent kitchen and do not want to get anything on it!!!

Days 30-31

So the last 2 days of working on Tiny, we have done the pipe for the venting the hot water heater, ordered all the appliances (composting toilet, refrigerator, solar and wind power, all the modules to go with them – all arriving this week), painted layer 2 and 3 on the walls and finished the floor in the kitchen since we go get the refrigerator today!!! We are sooooo close!!

Paint layer 2

 

 

 

 

 

 

Floors in Kitchen: Sealed, Sanded, Stained and Cleared.

 

 

 

 

 

 

 

The Third layer of Paint DONE! (well minus where I could not walk on the floors yet)

 

 

 

 

 

 

 

 

 

 

 

 

 

TOMORROW: I do the bathroom – mastic and paint everything I can including drylok the floor so I can then get ready for the Toilet and tiling. 😀

Days 25-29

We did the bathroom, the closet and I started the painting… FIRST.COAT.DOWN

The concrete board is up for the shower, the walls are completely done, now we have to seal it, paint it then floor it… then the composting toilet will be ordered.

 

 

 

 

 

 

 

We also started our water collection system from the artesian well on our property. That took the day after the shower being done

Image result for natural spring water collection

The closet and the walls for the closet are up and the shelf and hanging bar are in! That hole is a door opening so we do not have to climb into the loft to get into the closet… we will be creating a door for it once we get the slider bathroom door up.

 

 

 

 

 

 

First Coat DONE!!! I have a few more to do since I am doing an abstract art piece on the walls.

Once I am done painting we will seal everything then we will do the floors, storage units, sofa, and then last but not least place the refrigerator. 😀